Projects · Owner's Representation, Site Development & Prototype Deployment
A selection of work managed by Ashtonco, LLC, on conventional construction and on first-of-a-kind technology, with the same hands-on approach on both.
Conventional construction
Owner's representative and site work
Field observation from site work to opening day, so each project was built to the drawings and to the standard the owner expected.
Kraft Heinz · Lathrop, CA
Multi-track rail spur relocation
Relocated a multi-track rail spur tied into the mainline, well over a mile of track, along with site development and a covered rail dock.
Finished on schedule, clearing the way for an 800,000 sf building with multiple rail docks to be built where the old track stood.

Food 4 Less · Manteca, CA
New 55,000 sf grocery store
Ground-up construction of a 55,000 sf grocery store, from site work through opening day.
Opened on time.
Watson Ranch · American Canyon, CA
Master-planned community site development
Site development for McGrath Properties' 309-acre master-planned community in Napa County, turning raw fields into large parcels and individual lots, including the hotel site.
Also civil site work in Tracy, CA.
Starbucks · Tracy, CA
Ground-up drive-thru store
New drive-thru store, opened on time.
New technology
Field deployment of first-of-a-kind hardware
Taking prototypes from the engineer's drawing to a working installation in the field: fabrication, logistics, test sites and heavy lifts.
Makani, a project within Google
Energy kite ground stations
Managed fabrication, assembly, shipping and installation of ground stations weighing up to 57,000 lbs, at test sites from California to Hawaii to Norway.
A complex, demanding program requiring international travel. Finished ahead of schedule and on budget.
Aviation · Airworthiness
eVTOL passenger survivability crash test
Project management in support of airworthiness for passengers, specifically whether passengers survive a crash.
We designed a full-scale test using two cranes, one side-boom loaded, to drop the aircraft into a controlled impact. High-speed cameras recorded the crash, and a crash test dummy fitted with highly sensitive sensors measured the forces passengers would experience.

Offshore wind
Wind buoy deployment logisticsIdentified possible sites and deployment methods at multiple Pacific coast locations, and lined up local labor, vessel hauling, dock support and haul-out services, supporting the Bureau of Ocean Energy Management (BOEM) in quantifying deepwater Pacific offshore wind call areas.

Space hardware · Confidential client
Rocket prototype test siteTest site setup and support services for a rocket prototype developer.
Hydrogen · Confidential client
Movable hydrogen productionSupport services for a developer of lightweight, movable hydrogen production facilities.
Marine
Shipyard project management
Eight-plus years at a Bay Area shipyard, rising from project manager to senior PM and industrial sales program manager.
Bay Area Shipyard
Battleship USS IowaPainted the battleship from the waterline to the mast, including sandblasting the 01 deck, and restepped the mast that had been removed so she could fit under a bridge. She is now a museum ship in Los Angeles.

Bay Area Shipyard
Drydock vessel repairHull repair on vessels in drydock.

Bay Area Shipyard
Tugboat repowerNew engines lifted into a tug in drydock.
Before Ashtonco
Where the experience comes from
- APD Ashton Construction, Oakland (1990–2008): principal of a commercial construction subcontractor, with projects including the Sony Metreon in San Francisco, the Children's Hospital Oakland medical office building and an SFO cargo facility.
- Bay Area Shipyard (2008–2017): project manager, senior PM and industrial sales program manager.
- Crowley Maritime, Prudhoe Bay, Alaska: Arctic marine operations at a remote North Slope site: tug and barge maintenance, pumping and sealift support, rising to crew chief.
Ashtonco, LLC · Licensed California General Contractor #1058186 · (510) 773-0622